|
|
MING MINE PROJECT
Gold Zone
- Close proximity to the already developed ramp and easily accessible with virtually no development cost.
- Additional holes have been planned to determine the orientation and extent of the mineralization.
| Highlights: Gold Zone |
| Hole |
From (m) |
To (m) |
Length (m) |
Length (feet) |
Cu (%) |
Au (g/T) |
| RMUG07-01 |
0.00 |
34.40 |
34.40 |
112.86 |
0.61 |
1.84 |
| including |
19.50 |
34.40 |
14.90 |
48.88 |
1.27 |
3.28 |
| including |
29.20 |
34.40 |
5.20 |
17.06 |
2.96 |
6.57 |
| |
|
|
|
|
|
|
| RMUG07-02 |
78.70 |
81.70 |
3.00 |
9.84 |
0.37 |
1.91 |
| |
|
|
|
|
|
|
| RMUG07-04 |
9.40 |
13.00 |
3.60 |
11.81 |
1.06 |
0.79 |
| including |
10.40 |
12.10 |
1.70 |
5.58 |
2.24 |
1.58 |
| |
|
|
|
|
|
|
| RMUG07-07a |
11.80 |
39.00 |
27.20 |
89.24 |
0.05 |
1.23 |
| including |
18.80 |
33.60 |
14.80 |
48.56 |
0.07 |
1.89 |
| including |
18.80 |
23.70 |
4.90 |
16.08 |
0.03 |
3.02 |
| |
|
|
|
|
|
|
| RMUG07-08 |
0.00 |
34.50 |
34.50 |
113.19 |
0.29 |
1.34 |
| including |
29.30 |
34.00 |
4.70 |
15.42 |
0.70 |
3.56 |
|